Customisation should adapt a verified movable glass partition platform to the project. It does not mean inventing untested performance or ignoring structural, operational and installation constraints.
Opening geometry, panel proportions, track route, parking position, glass appearance, frame finish, pass doors and operation mode can be reviewed against the available system.
Exact dimensions, weights, acoustic values, fire performance, hardware and electrical functions must be supported by approved drawings, calculations or first-party reports.
Customisation adapts a verified EBUNGE movable glass partition platform to the project. It never means inventing untested performance or ignoring structural, operational and installation constraints. Each project moves through the review steps below.
Each project brief resolves four configuration directions before detailing continues.
The project’s privacy and visual goals determine the glass direction: clear single glazing for maximum transparency, or framed double glazing when enhanced speech privacy
Framed systems give defined edges and support double glazing and pass doors; frameless systems maximise transparency with single glazing. The selection is confirmed with
Track route, parking pocket and any integrated pass door are coordinated with the ceiling, structure, lights, sprinklers and doors. Parking geometry and door position are
Manual or assisted operation is confirmed against usage expectations and services. Frame colours, glass appearance and finish details are matched to the interior palette
The project moves from brief to production through a fixed review path. Each step is confirmed before the next starts.
Opening geometry, room use and traffic pattern define the brief.
Drawings and site interfaces are reviewed against the system range.
Glass, frame, operation and parking directions are confirmed.
Project-specific shop drawings are prepared and approved.
Fabrication follows the approved drawings only.
Components are checked against the approved documents.
Export packing is prepared for the delivery programme.
Packing lists and project delivery records are prepared for the agreed scope.
After the review, EBUNGE prepares the project-specific discussion and, when authorised, the shop drawings that define panel dimensions, track layout and hardware. Production follows the approved drawings only; no assumptions carry into fabrication.
Production is checked against the approved drawings, and completed components are prepared for export packing with the delivery destination and programme in mind. Shipping terms, packing method and documentation are coordinated per order. EBUNGE’s documented quality and environmental management systems and conformity documents are available on the Certifications page; project-specific configuration is available upon drawing review.
Send your opening dimensions, drawings, application, preferred glass or frame, operation mode, delivery location and required schedule.