CONFIGURATION

Custom Movable Glass Partition Systems

Customisation should adapt a verified movable glass partition platform to the project. It does not mean inventing untested performance or ignoring structural, operational and installation constraints.

Customisable Project Inputs

Opening geometry, panel proportions, track route, parking position, glass appearance, frame finish, pass doors and operation mode can be reviewed against the available system.

Exact dimensions, weights, acoustic values, fire performance, hardware and electrical functions must be supported by approved drawings, calculations or first-party reports.

How EBUNGE Customises a Project

Customisation adapts a verified EBUNGE movable glass partition platform to the project. It never means inventing untested performance or ignoring structural, operational and installation constraints. Each project moves through the review steps below.

Configuration Decisions

Each project brief resolves four configuration directions before detailing continues.

Clear framed movable glass partition in a modern commercial interior

Glass & Transparency

The project’s privacy and visual goals determine the glass direction: clear single glazing for maximum transparency, or framed double glazing when enhanced speech privacy

Framed and frameless movable glass partition systems

Framed or Frameless

Framed systems give defined edges and support double glazing and pass doors; frameless systems maximise transparency with single glazing. The selection is confirmed with

Overhead track coordination for movable glass partitions

Track, Parking & Pass Door

Track route, parking pocket and any integrated pass door are coordinated with the ceiling, structure, lights, sprinklers and doors. Parking geometry and door position are

Movable glass partition operation and finish selection

Operation & Finish

Manual or assisted operation is confirmed against usage expectations and services. Frame colours, glass appearance and finish details are matched to the interior palette

From Drawings to Production

The project moves from brief to production through a fixed review path. Each step is confirmed before the next starts.

Commercial opening prepared for a movable glass partition

1 · Opening

Opening geometry, room use and traffic pattern define the brief.

Project team reviewing movable glass partition requirements

2 · Project Review

Drawings and site interfaces are reviewed against the system range.

Movable glass partition system selection for a commercial project

3 · Selection

Glass, frame, operation and parking directions are confirmed.

Movable glass partition project drawing coordination

4 · Drawings

Project-specific shop drawings are prepared and approved.

Full-size movable glass partition panels in production

5 · Production

Fabrication follows the approved drawings only.

Full-size movable glass partition panel quality inspection

6 · QC

Components are checked against the approved documents.

First-party EBUNGE plywood export crates loaded on a delivery truck

7 · Packing

Export packing is prepared for the delivery programme.

Movable glass partition drawings and documentation

8 · Dispatch Documents

Packing lists and project delivery records are prepared for the agreed scope.

After the review, EBUNGE prepares the project-specific discussion and, when authorised, the shop drawings that define panel dimensions, track layout and hardware. Production follows the approved drawings only; no assumptions carry into fabrication.

Quality Control & Export Packing

Production is checked against the approved drawings, and completed components are prepared for export packing with the delivery destination and programme in mind. Shipping terms, packing method and documentation are coordinated per order. EBUNGE’s documented quality and environmental management systems and conformity documents are available on the Certifications page; project-specific configuration is available upon drawing review.

Full-size movable glass partition panels in production

Production Workshop & Full-Size Panel Preparation

Full-size movable glass partition panel quality inspection

Panel Assembly & Quality Inspection

First-party EBUNGE export crate loaded on a delivery truck

First-Party Export Packing & Loading

Request a Project Review

Send your opening dimensions, drawings, application, preferred glass or frame, operation mode, delivery location and required schedule.